Skip to main content
Loading...

Streambank Stabilization

This project consisted of repairing the banks of a section of Cane Run and a section of a tributary to Cane Run flowing through Shadybrook Park, located on the Lexmark International property. Cane Run is a stream in Lexington, KY that has been identified by the Kentucky Division of Water as unable to support aquatic wildlife or primary contact recreation. The banks of Shadybrook Park were eroded and largely void of aquatic habitat due to an urban watershed, non-point-source pollutants in the stormwater and intense volumes of runoff. EcoGro teamed with project partners to design and build approximately 1,350 feet of stabilized banks along Cane Run and its tributary. The banks were seeded with a selection of native grasses and wildflowers and then covered with a biodegradable erosion control blanket.

Key Features:

  • Design/build
  • Bank stability
  • Native plants
  • Riffle and pool construction
  • Riparian buffer
  • Biodegradable erosion controls

Project Partners

Awards

LFUCG Environmental Commission Award

Other Similar Projects

Sruth Fuisce Feasibility study
|

Ecogro was hired by a Paris horse farm owner to conduct a feasibility study and costestimate for improvements to a large pond in the Licking River…

Read More
Green Acres Stream Buffer Enhancement
|

For many years, residents in the Green Acres and Hollow Creek neighborhoods had experienced a variety of flooding, sanitary sewer and storm water…

Read More
Valley Park Stream Crossing
|

With citizens constantly crossing through the creek and a new sewer running under the creek, the stream crossing at Valley Park was a much needed…

Read More