Skip to main content
Loading...

Erosion and Sediment Control

EcoGro was sub-contracted to install an in-stream sediment check dam during channel excavation using Filtrexx® compost Filtersoxx. A designated riparian buffer area along the banks of the stream was seeded with native grasses and wildflowers. The exposed soil was then covered with erosion control blanket. EcoGro was able to provide ongoing maintenance and monitoring of the restoration to ensure successful habitat establishment.

Key Features:

  • Filtrexx® Filtersoxx
  • Bank stabilization
  • Urban hydrology
  • Native wildflowers
  • Riparian buffer
  • Maintenance
  • Biodegradable erosion control blanket

Project Files:

Eastland Project Profile

Related Links: 


Other Similar Projects

Walnut Hill Club
|

The Walnut Hill Club at Chilesburg Owners Association was experiencing larger volumes of stormwater entering their property from surrounding areas.…

Read More
Buckhorn Park
|

The city of Lexington’s Division of Parks and Recreation needed to address an eroding stormwater channel in the city’s newest public park. This…

Read More
LCM Amtek
|

Linden Long, owner of LCM Company, has seen his share of steep slopes. He claims that the problem is only getting worse due to the fact that people…

Read More