Erosion and Sediment Control

EcoGro was sub-contracted to install an in-stream sediment check dam during channel excavation using Filtrexx® compost Filtersoxx. A designated riparian buffer area along the banks of the stream was seeded with native grasses and wildflowers. The exposed soil was then covered with erosion control blanket. EcoGro was able to provide ongoing maintenance and monitoring of the restoration to ensure successful habitat establishment.

Key Features:

  • Filtrexx® Filtersoxx
  • Bank stabilization
  • Urban hydrology
  • Native wildflowers
  • Riparian buffer
  • Maintenance
  • Biodegradable erosion control blanket

Project Files:

Eastland Project Profile

Related Links: 


Other Similar Projects

Mill Creek Elementery
|

In conjunction with the Mill Creek stream restoration, multiple wetlands were constructed to provide both aquatic habitat diversity and water quality…

Read More
First Alliance Church
|

First Alliance Church was having difficulty maintaining a steep section of turf next to a newly constructed detention pond. The exposed soil was…

Read More
Lexmark OSCAR
|

Trash pollution in our waterways is one of the largest and readily visible issues affecting our water today. In addition to destroying habitat,

Read More