Skip to main content
Loading...

Constructed Wetland

EcoGro was contacted to provide assistance on a constructed wetlands site at the Blue Ridge landfill facility in Irvine, KY. EcoGro installed a compost filter cell in the existing basin. The purpose was to force the water entering to navigate completely through the system, creating a longer hydraulic residence time and allowing for more deposition, filtration, vegetative uptake and bioremediation.

Key Features:

  • Compost-based products
  • Water quality BMP

Other Similar Projects

Lexmark Bioretention
|

The combination of impervious roof areas and parking lots on the 264 acre campus produce significant stormwater volume and water quality…

Read More
Bluegrass Station
|

With the increase in projects aimed at re-establishing the health and stability of our waterways there has been a growing need for competent…

Read More
Gunpowder Creek
|

The Gunpowder Creek dam was originally constructed to serve as a water supply reservoir for the Camp Michaels Boy Scout Camp in Boone

Read More