Skip to main content
Loading...

Constructed Wetland

EcoGro was contacted to provide assistance on a constructed wetlands site at the Blue Ridge landfill facility in Irvine, KY. EcoGro installed a compost filter cell in the existing basin. The purpose was to force the water entering to navigate completely through the system, creating a longer hydraulic residence time and allowing for more deposition, filtration, vegetative uptake and bioremediation.

Key Features:

  • Compost-based products
  • Water quality BMP

Other Similar Projects

Town Branch Phase I
|

The purpose of this project was to lengthen and restore 5,862 feet of degraded channel in Town Branch at Winchester, KY. This Clark County tributary…

Read More
Woodfield Pond
|

EcoGro was contracted by the Woodfield Homeowners Association to provide an attractive solution to address an eroding pond edge. A large volume of…

Read More
Veterans Park Dam Removal
|

In February of 2019, the project team of EcoGro, Ridgewater, and Stantec were hiredby the city of Lexington’s Division of Environmental Services to…

Read More