Skip to main content
Loading...

DESIGN / FEASIBILITY STUDY

Ecogro was hired by a Paris horse farm owner to conduct a feasibility study and cost estimate for improvements to a large pond in the Licking River watershed. This pond will be a key feature to be viewed from where the owner will build a new house. Although the pond is approximately 0.8 acres and receives drainage from about 18 acres, it was shallow and not filling to capacity. Erosion of the spillway had cut into the earthen dam and threatened to lower the pond level even further. Bush honeysuckle and growth around the pond blocked views. Runoff from agriculture added nutrients to the water and boosted algae. The shallow depth and minimal habitat could not fully support sport fishing. Because of the pond’s prominence, the owner wanted to see if and how it could be upgraded to a main attraction.


Project Partners


Other Similar Projects

Bluegrass Station
|

With the increase in projects aimed at re-establishing the health and stability of our waterways there has been a growing need for competent…

Read More
Lexington Green
|

The Mall at Lexington Green had been suffering from erosion along its pond banks for several years. The numerous geese that were attracted to the…

Read More
Woodfield Pond
|

EcoGro was contracted by the Woodfield Homeowners Association to provide an attractive solution to address an eroding pond edge. A large volume of…

Read More