Skip to main content
Loading...

Stormwater Best Management Practices

The purpose of this project was to implement a variety of stormwater Best Management Practices (BMPs) to improve water quality in Cane Run at the Kentucky Horse Park. The park was selected as a key location to implement and demonstrate practical ways to reduce pollution in Cane Run. The quality of water in Cane Run is listed by the Kentucky Division of Water as impaired due to pollutants such as sediment, excessive nutrients, manure and urban runoff. Stormwater quality improvements in this area will benefit Cane Run and the Royal Springs Aquifer (which serves as the drinking supply water for the City of Georgetown). EcoGro was hired to assist with BMP selection, design and construction. 

Key Features:

  • Design / Build
  • Pond dredging
  • Stream bank grading
  • Bioretention basins
  • Funding for this project was provided by an EPA 319 grant to implement water quality improvements in the Cane Run Watershed.

Other Similar Projects

Lambert Run MNF
|

EcoGro was hired to build High altitude wetlands that serve as both a natural filter for runoff and habitat for a diversity of aquatic and semi-…

Read More
West Milton Dam Removal & Stillwater River Restoration
|

The West Milton dam was constructed in 1910 to generate electricity for the trolley that went from Dayton to West Milton, Ohio and was later used as…

Read More
Town Branch Phase II
|

The purpose of this project was to lengthen and restore 5,862 feet of degraded channel in Town Branch at Winchester, KY. This Clark County tributary…

Read More