Skip to main content
Loading...

Slope Stabilization

EcoGro was contacted to provide stabilization solutions for an eroded stream bank. During the restoration construction process a rock toe was installed along 400 feet of an eroded streambank. However, due to site limitations, the designers also needed a product to stabilize the steep, bare slope without removing existing trees. A compost-based “Living Wall” application was selected to establish vegetation and stabilize the slope.

Key Features:

  • Bioengineering
  • Bank stabilization
  • Filtrexx® Filtersoxx living wall
  • BFM hydroseeding

Other Similar Projects

Clays Spring Park
|

It began with a search for water that disappeared from the landscape. We were looking to uncover and restore a historic spring that was once part of…

Read More
West Milton Dam Removal & Stillwater River Restoration
|

The West Milton dam was constructed in 1910 to generate electricity for the trolley that went from Dayton to West Milton, Ohio and was later used as…

Read More
Bluegrass Station
|

With the increase in projects aimed at re-establishing the health and stability of our waterways there has been a growing need for competent…

Read More