Skip to main content
Loading...

DESIGN / FEASIBILITY STUDY

EcoGro was contacted by Dr. Tuttle to assess a situation involving stormwater runoff from a historic property in the heart of downtown Lexington. The client’s concern centered on stormwater from parking lots and buildings appeared to have been routed towards an old limestone retaining wall running along Vine Street. Following heavy rains, water had been observed flowing over the wall as well as seeping out of cracks and gaps. It was unclear as to where water was going, the existence and condition of stormwater infrastructure, as well as the boundaries of the work area. We recommended a stormwater feasibility study to answer these questions. In 2022, EcoGro partnered with Stantec Consulting Services to develop and submit a stormwater grant application.


Project Partners

Funding Partners


Other Similar Projects

Veterans Park Dam Removal
|

In February of 2019, the project team of EcoGro, Ridgewater, and Stantec were hiredby the city of Lexington’s Division of Environmental Services to…

Read More
UK Alumni Drive Stream Restoration
|

To combat a storm water problem on University of Kentucky’s campus, the Stantec / Ridgewater / Bell Engineering / EcoGro team designed and then…

Read More
Lexmark Shadybrook Park
|

This project consisted of repairing the banks of a section of Cane Run and a section of a tributary to Cane Run flowing through Shadybrook Park,…

Read More