Skip to main content
Loading...

DESIGN / FEASIBILITY STUDY

Ecogro was hired by a Paris horse farm owner to conduct a feasibility study and cost estimate for improvements to a large pond in the Licking River watershed. This pond will be a key feature to be viewed from where the owner will build a new house. Although the pond is approximately 0.8 acres and receives drainage from about 18 acres, it was shallow and not filling to capacity. Erosion of the spillway had cut into the earthen dam and threatened to lower the pond level even further. Bush honeysuckle and growth around the pond blocked views. Runoff from agriculture added nutrients to the water and boosted algae. The shallow depth and minimal habitat could not fully support sport fishing. Because of the pond’s prominence, the owner wanted to see if and how it could be upgraded to a main attraction.


Project Partners


Other Similar Projects

Blue Ridge Landfill
|

EcoGro was contacted to provide assistance on a constructed wetlands site at the Blue Ridge landfill facility in Irvine, KY. EcoGro installed a…

Read More
UK Maine Chance Farm
|

EcoGro was hired to construct ecological enhancements along approximately 850 linear feet of an un-named tributary to Cane Run at the University of…

Read More
Green Acres Stream Buffer Enhancement
|

For many years, residents in the Green Acres and Hollow Creek neighborhoods had experienced a variety of flooding, sanitary sewer and storm water…

Read More