Skip to main content
Loading...

Erosion and Sediment Control

EcoGro was contracted to hydroseed native wildflower seeds on a 4+ acre stream restoration project conducted by another company. After work on the new stream channel and floodplain was complete EcoGro hydroseeded disturbed areas to be re-vegetated.

Key Features:

  • Hydroseeding
  • Native plants
  • Riparian buffer

Other Similar Projects

Idle Hour Park
|

The design/build team of EcoGro, Stantec and Ridgewater was hired by the city ofLexington’s Division of Environmental Services to assess an eroding…

Read More
Lexington Green
|

The Mall at Lexington Green had been suffering from erosion along its pond banks for several years. The numerous geese that were attracted to the…

Read More
Brushy Creek
|

EcoGro was contracted to hydroseed native wildflower seeds on a 4+ acre stream restoration project conducted by another company. After work on the…

Read More