Skip to main content
Loading...

Wetlands Mitigation

The purpose of this project was to restore Kentucky native plants to a disturbed wetland. EcoGro was hired to develop a wetland species list and install plant materials. Trees, grasses, sedges, rush and various wildflowers were selected based on site suitability and cost considerations. The native plants and an annual cover crop were installed to re-vegetate the denuded site and to help prevent soil erosion.

Key Features:

  • Wetland mitigation
  • Native plants
  • Design/build

Other Similar Projects

Town Branch Phase II
|

The purpose of this project was to lengthen and restore 5,862 feet of degraded channel in Town Branch at Winchester, KY. This Clark County tributary…

Read More
Coldstream Park
|

The Cane Run watershed is designated as a resource protection area that feeds the drinking water supply for the city of Georgetown. As a 303d-listed…

Read More
Mill Creek
|

Fayette County Public Schools had the vision to improve 700 feet of Mill Creek in Lexington, Kentucky. The stream was an eroding, urban ditch that…

Read More