Skip to main content
Loading...

Constructed Wetland

EcoGro was contacted to provide assistance on a constructed wetlands site at the Blue Ridge landfill facility in Irvine, KY. EcoGro installed a compost filter cell in the existing basin. The purpose was to force the water entering to navigate completely through the system, creating a longer hydraulic residence time and allowing for more deposition, filtration, vegetative uptake and bioremediation.

Key Features:

  • Compost-based products
  • Water quality BMP

Other Similar Projects

First Alliance Church
|

First Alliance Church was having difficulty maintaining a steep section of turf next to a newly constructed detention pond. The exposed soil was…

Read More
Sunny Slope Farms
|

Originally purchased by the Sunny Slope Farms Homeowner’s Association in 2018, this riparian greenway sits on a 1.6-acre buffer between the

Read More
Lexmark OSCAR
|

Trash pollution in our waterways is one of the largest and readily visible issues affecting our water today. In addition to destroying habitat,

Read More