Skip to main content
Loading...

Constructed Wetland

EcoGro was contacted to provide assistance on a constructed wetlands site at the Blue Ridge landfill facility in Irvine, KY. EcoGro installed a compost filter cell in the existing basin. The purpose was to force the water entering to navigate completely through the system, creating a longer hydraulic residence time and allowing for more deposition, filtration, vegetative uptake and bioremediation.

Key Features:

  • Compost-based products
  • Water quality BMP

Other Similar Projects

Coca-Cola Wichita
|

Continuing from successful stormwater BMPs installed at its Lexington facility, Coca Cola hired EcoGro to design and construct stormwater…

Read More
Coca-Cola Stormwater Replenish Project
|

To continue Coca-Cola’s commitment to clean water, the Lexington Coca-Cola facility was awarded a grant from the city of Lexington to expand water…

Read More
Sruth Fuisce Feasibility study
|

Ecogro was hired by a Paris horse farm owner to conduct a feasibility study and costestimate for improvements to a large pond in the Licking River…

Read More