Skip to main content
Loading...

Streambank Stabilization

The purpose of this project was to provide a green technique for stabilizing an eroding streambank in conjunction with infrastructure upgrades. The Filtrexx® Living Wall™ system is a tubular netting that is filled in place with a combination of topsoil, hardwood mulch and grass seed. A selection of riparian tree species was planted between each row of Filtrexx®. As a result the combination of structural and vegetative materials will create a stable bank that also offers environmental benefits: pollutant removal, shade for cooler water, wildlife habitat and visual interest.

Key Features:

  • Design consultation
  • Bank stabilization
  • Bioengineering
  • Native trees and shrubs

Other Similar Projects

Brushy Creek
|

EcoGro was contracted to hydroseed native wildflower seeds on a 4+ acre stream restoration project conducted by another company. After work on the…

Read More
Walnut Hill Club
|

The Walnut Hill Club at Chilesburg Owners Association was experiencing larger volumes of stormwater entering their property from surrounding areas.…

Read More
Valley Park Stream Crossing
|

With citizens constantly crossing through the creek and a new sewer running under the creek, the stream crossing at Valley Park was a much needed…

Read More