Skip to main content
Loading...

Streambank Stabilization

The purpose of this project was to provide a green technique for stabilizing an eroding streambank in conjunction with infrastructure upgrades. The Filtrexx® Living Wall™ system is a tubular netting that is filled in place with a combination of topsoil, hardwood mulch and grass seed. A selection of riparian tree species was planted between each row of Filtrexx®. As a result the combination of structural and vegetative materials will create a stable bank that also offers environmental benefits: pollutant removal, shade for cooler water, wildlife habitat and visual interest.

Key Features:

  • Design consultation
  • Bank stabilization
  • Bioengineering
  • Native trees and shrubs

Other Similar Projects

Veterans Park Dam Removal
|

In February of 2019, the project team of EcoGro, Ridgewater, and Stantec were hiredby the city of Lexington’s Division of Environmental Services to…

Read More
UK FEMA Flood Mitigation Project
|

This project, designed by Bell Engineering, is intended to serve a dual-purpose as a passive park with stormwater management functions. As a $12,000,…

Read More
Montessori Middle School of Kentucky
|

The purpose of this project is to improve water quality and reduce stormwater runoff in the South Elkhorn watershed. In addition, the project will…

Read More