Skip to main content
Loading...

The EcoGro, Ridgewater, Stantec Team worked to develop a stream mitigation project at the tailwaters of Lake Cumberland. The goal of this Design/Build project is to create Stream and wetland mitigation credits for KDFWR, with one other goal of creating a self-sustaining trout population. Water that feeds into the USFWS Wolf Creek National Fish Hatchery will now flow through nearly 6,000 linear feet of new stream channel and wetlands.  

Key Features:

  • Design / Build
  • Stream and Wetland Construction
  • Trout Habitat
  • Fish Passage from Cumberland River

Contact Us

All the fields are required

Project Team

Project Partners


Other Similar Projects

Eureka Springs
|

It’s typical to see old stormwater basins with only mowed of turf grass and the occasional concrete flume along the bottom. In the early days of…

Read More
Town Branch Phase II
|

The purpose of this project was to lengthen and restore 5,862 feet of degraded channel in Town Branch at Winchester, KY. This Clark County tributary…

Read More
Eastland
|

EcoGro was sub-contracted to install an in-stream sediment check dam during channel excavation using Filtrexx® compost Filtersoxx. A designated…

Read More