Skip to main content
Loading...

Wetland Construction

In conjunction with the Mill Creek stream restoration, multiple wetlands were constructed to provide both aquatic habitat diversity and water quality treatment. Most were created as groundwater wetlands within the floodplain hyporheic zone. However, one special wetland established above the floodplain was built by Mill Creek Elementary students. Wetland guru Tom Biebighauser, Wildlife Biologist with the U.S. Forest Service, led the students through wetland construction. Tom explained the importance of wetlands and provided a unique "hands-on" educational experience the students will never forget. They helped prepare the soil, installed a liner, sowed seed, spread straw and used rocks to build habitat features. The site continues to be used as an outdoor classroom for Mill Creek teachers.

Key Features:

  • Wetland creation
  • Native plants
  • Outdoor classroom
  • Educational event

Other Similar Projects

Town Branch Phase I
|

The purpose of this project was to lengthen and restore 5,862 feet of degraded channel in Town Branch at Winchester, KY. This Clark County tributary…

Read More
South Fork Curry's Fork
|

The purpose of this project was to mitigate stream losses in the Salt River Basin by restoring approximately 3,734 ft of South Fork Curry’s Fork and…

Read More
UK FEMA Flood Mitigation Project
|

This project, designed by Bell Engineering, is intended to serve a dual-purpose as a passive park with stormwater management functions. As a $12,000,…

Read More